
SFO Terminal 1 Electrical – S. San Francisco, CA
This project was for the Harvey Milk Terminal 1 remodel, which was under an aggressive SFO Net Zero Program targeting zero carbon, zero waste, and net-zero energy. NBA Engineering provided electrical site investigations for all existing electrical power (conduits, etc.) for the electrical contractor, providing demolition and as-built drawings, especially in the areas that the baggage claim system was being relocated or modified.
In addition, NBA provided lighting design for Terminal 1C including the Arrival Level 1, Departure Level 2, Mezzanine Level 2M, Basement Level B1, and Roof Level R2. The design uses 100% LED fixtures with daylight harvesting controls, which significantly reduced the terminal’s lighting power density. The lighting works together with the electrochromic glazing: as the glass tints in strong sun and natural light fills the concourse, the controls dim the lights. This lowers both the lighting load and the cooling load.
The terminal has since become the first airport terminal in the world to earn LEED v4 Platinum certification and is on track for a 60% reduction in energy use.
