Phone (415) 202-9840

Fax (415) 202-9838

© 2017 by NBA Engineering, Inc., All Rights Reserved

Fremont Unified School District- Fremont, CA

Provided Electrical Power plan for modification and addition of electrical outlets, smoke detectors, and telephone conduits. Modification to the lighting layout, Title 24 Energy calculations. Construction administration; review shop drawings, respond to RFI’s.