Project
Oakland Outer Harbor Container Terminal
Berth 27 (Transbay Terminal)
Port of Oakland, CA |
|
Client
Port of Oakland
530 Water Street, 2nd Floor
Oakland, CA 94607 |
|
Thomas H. Daniels
Chief Engineer |
|
Duration
1988-1991 |
|
Cost
$12,000,000 |
|
|
|
| |
|
|
| |
 |
| |
| Description |
|
This 600-foot wharf represented an improved 2nd generation flat plate, free standing pile design. Substantially complete, it was left untouched during the Loma Prieta Earthquake, which is similar to our 1st generation Howard Terminal. The project contains a sheet pile bulkhead with one 100-foot crane rail on the structure and the other on a pile supported grade beam in back of bulkhead.
Project required various alternatives before a final design was selected. |
|
| Firm’s Role |
|
| All work required. |
|