Project
Carnation Container Terminal
Trapac Matson, Transbay Extension System Terminals
Port of Oakland, CA |
|
Client
Port of Oakland
530 Water Street, 2nd Floor
Oakland, CA 94607 |
|
Thomas H. Daniels
Chief Engineer
510.627.1100 |
|
Duration
1990-1996 |
|
Cost
$28,000,000 |
|
|
|
| |
|
|
| |
 |
| |
| Description |
|
F.E. Jordan Associates, Inc. was selected to undertake a study of alternative wharf systems and final design for the Carnation Container/Terminal. The scope of work for this project included the evaluation of wharf design alternatives and final design of the 1200- foot Carnation Container Terminal Wharf, a 300-foot extension of the Matson Container Terminal and a 600-foot extension of the Oakland Container Terminal.
Project required various alternatives before a final design was selected.
Final design for the Carnation Terminal project required the evaluation of three alternative fendering systems, the design of the girders for a 100-foot gauge gantry crane, provision for the crane to travel around a corner on a large radius rail, utility design, electrical and all required dredging and shore protection. |
|
| Firm’s Role |
|
| All work required. |
|