NBA Engineering Inc. consists
of licensed engineers, licensed C-20 Contractors, LEED
accredited Professionals, Construction Managers and other
professionals working together to provide clients optimal
engineering solutions on time and within budget.
Avalon Bay at Mission Bay San Francisco, California
NBA participated in the original design
which consisted of three buildings:
a 17 story high-rise, a 9 story mid
rise, and a 5 story low rise with subterranean
parking totaling about 424,000 sq ft.
Due to budget issues and market conditions
only the high rise has been built so
far. NBA Engineering Inc. responsibilities
included: electrical design, power,
lighting, emergency power, and fire
alarm systems. Also provided Title 24
energy calculations for lighting, performance
specifications, calculations to determine
required capacity of power, and provisions
for security and telecom systems. This
was a design build project.
Catellus Bay at Mission Bay San Francisco, California
10,000 square feet of ground floor commercial
and 290 residential units in three mixed
use buildings (high, medium and low
rise) and subterranean parking structures
in Mission Bay San Francisco. Provided
HVAC, plumbing, fire protection, electrical
power, lighting, emergency power and
Title 24 energy calculations for lighting
and envelope design. Prepared performance
specifications for electrical systems.
Provided calculations to determine required
capacity of power and gas lines.
Courtside Village Santa Rosa, California
Courtside Village is a 70 acre urban
housing project in Santa Rosa, CA. The
core area is planned with 30,000 sq.
ft. of neighborhood commercial and apartments
above. Live/ work units will be offered
along the core area. Homes will range
from 1100 sq. ft. to 2400 sq. ft. The
village will include multi-family rental
units. In addition to homes, a church,
school and a tennis/ health club are
planned..
Dudley Apartments San Francisco, California
Built in 1913 as the former Dudley Hotel,
the property once contained 110 SRO
units. In 1989, this building was significantly
damaged in the earthquake and in the
late 90’s sustained a fire that
displaced all the residents.It will
contain a total of 75 units and 6,400
square feet of ground floor commercial
space and a basement. The San Francisco
Redevelopment Agency was involved in
this project..
Natoma Residential Building San Francisco, California
NBA provided HVAC, plumbing, fire protection,
electrical power distribution, lighting,
telecommunication and fire alarm systems
design for two apartment buildings (4-story
and 5-story) 78 units consisting of
studios, two/three bedroom, townhouses
and a daycare center. This was a San
Francisco Redevelopment Agency Project.
Providence Senior Housing San Francisco, California
This is a 5 story, 57,000sq. ft. (including
garage) building with 50 units of senior
housing. This project includes interaction
with the Fire Marshall, PG&E, and
San Francisco Water and Sewer Department.
NBA provided preliminary design of HVAC,
plumbing, electrical power, lighting
emergency lighting. NBA also outlined
specifications for fire alarm system.
St Regis Museum Tower San Francisco, California
Poured in place and architectural pre-cast
concrete 5 star hotel, condominium and
museum. Includes 269 high end hotel
rooms, 102 luxury condominiums, 3 story
Museum of African Diaspora, and a four-level
subterranean garage below the building.
NBA designed HVAC, plumbing, fire protection
and reviewed electrical power, lighting,
emergency power, and fire alarm system
and telephone and communications systems
Wildhorse Apartments Davis, California
NBA designed the HVAC, mechanical, plumbing
and fire protection systems for a new,
78 unit, and affordable multi-family
residential apartment complex. This
11-building complex of two and three
story buildings contains a community/recreation
building, pool and spa. Our team specified
an energy efficient combination water
heater and space heating system that
eliminated the need for gas space heating.
666 Ellis Street Towers San Francisco, California
The 13 Story Ellis Street Tower has
a community room and offices on the
first and second floors, and floors
3-12 are one-bedroom apartments and
studios. Our task for this project was
to provide construction documents for
plumbing system retrofit including ADA
compliance for handicapped units.
;
North Beach Apartments, San Francisco, California
Renovated outdoor sewer piping &
balcony drainage for North Beach Apartments
Site, which consisted of 13 buildings
and 229 family units. Cost estimate
was provided for the Construction of
the project. Construction Phase was
provided based on meetings with the
tenants & the SFHA staff to determine
what was the most cost-effective way
of relocating tenants during the construction.
Potrero Annex San Francisco, California
Researched and designed improvements
to the site water distribution system
as well as monitored hydronic testing.
Provided construction documents and
cost estimate for replacing all plumbing
fixtures to 269-units apartment buildings.
Upgraded main panel, overhead secondary
and piping overhead services to 23 housing
apartment buildings at Potrero Annex,
as well as adding a new laundry room.
We interacted with the San Francisco
Fire Marshall and San Francisco Building
Department for this project.
388 Townsend Street San Francisco, California
New five story new market rate condominium.
NBA Engineering Inc. provided the complete
plumbing and fire protection design.
The heating system consisted of gas
fire places. Plumbing fixtures were
selected by the architect and reviewed
by NBA. NBA also coordinated with the
other disciplines and responded to plan
check comments and was involved in permitting
with the San Francisco Building Department
and the San Francisco Fire Marshall.
4800 3RD Street San Francisco, California
This is a 5 story, 57,000sq. ft. (including
garage) building with 50 units of senior
housing There are total of four retail
spaces with 5,200 sq. ft. Provided HVAC
design, risers, mains and shaft spaces
and physical requirements of HVAC, plumbing
and fire protection. Met with Fire Marshall,
responded to plan check comments from
S.F. Building Department, met with water
and sewer department for utilities requirement,
met with PG&E for electrical transformer
sizing and locating.
Holy Family Day Home San Francisco, California
NBA is providing MEP design services
as part of the CCS Architecture team.
The new facility will enable the Day
Home to serve an additional 50 needy
children, increasing the capacity to
170 comparable with other early education
facilities in the Bay Area. The facility
will provide an after-hours meeting
and learning space for the community
and will re-establish a landmark at
an historic location.