| Transportation/Rail / Ports |
 |
|
|
| |
| |
|
 | |
Air
Train Maintenance and Storage Facility
San Francisco, California
NBA
provided project management, engineering
services and supervision of HVAC,
plumbing and fire protection systems
for the retrofit of an existing 75,000
sq. ft., 3-story multi-use building.
The facility building consisted of
air-train maintenance facilities,
electrical power distribution system
stations and electrical rooms. |
|
|
| |
|
|
 |
|
Bay
Area Rapid Transit Line and Track
San Francisco, California NBA Engineering
was responsible for the system-wide
raceway design and construction cost
estimate for BART’s 8.2-mile,
4-station extension serving San Francisco
International Airport. This included
drawings and specifications for installation
of all 8.2 miles of duct banks, raceways,
conduits and lateral conduit up to
gap breakers, switching stations,
and traction power substations. |
|
|
| |
|
|
 | |
BART
Maintenance Shop Facility Concord,
California NBA designed HVAC, plumbing,
fire protection, electrical power,
lighting distribution, fire alarm
systems, cost estimating and construction
staging for a new 45,000 sq. ft. shop
next to existing. We also provided
design for mechanical equipment such
as: car hoists, a truck lift, an overhead
crane, a jib crane, welding hoods,
dust collectors, compressed air and
a grease oil separator. Our firm also
provided design for retrofitting the
existing shop HVAC, plumbing and electrical
systems. |
|
|
| |
|
|
 |
BART
Hayward Shop Hayward, California Designed
electrical, power, lighting, fire
alarm, detection, telephone, and data
systems for the component Repair Shop
expansion. Title 24 energy calculation
was performed and energy measures
were considered in selecting the lighting
fixtures both indoors and outdoors.
Provided field surveys and prepared
as-built drawings. |
|
|
| | |
|
 |
|
BART
Intermodal Police Station Daly City,
California NBA designed HVAC, plumbing,
fire protection, lighting, power,
intrusion alarm detection and closed
circuit television systems for a police
station and pedestrian tunnel. We
also provided a sump-pumping system,
exterior lighting for parking lots
and pedestrian walkways. |
|
|
| |
|
|
 | |
BART
Extension Colma, California Our firm
provided an under-car fire protection
deluge system including valving in
tunnel wall niches. We designed and
provided tunnel lighting design and
walkway lighting for train operators.
NBA provided traction power and communications/signaling
raceways from the new substation to
all contact rail connection points
between the Colma station and the
end of the tunnel. |
|
|
| |
|
|
 | |
Boarding
Area G San Francisco Airport South
San Francisco, California NBA provided
the Mechanical, Electrical, and Fire
protection services for this three
story building plus mechanical penthouse
with a gross square footage of 368,000.
Provided construction inspection and
cost estimation which included verification
and negotiation of change order proposals
by the contractor for different disciplines
including HVAC, Plumbing and Fire
protection. . |
|
|
| | |
|
 |
|
Caltrans,
Dominguez Channel Bridge- Carson,
CA NBA provided construction inspection
services for a seismic retrofit of
Dominguez Channel at the Intersection
of Route 110, near Carson City. Caltrans,
District 59- Southern CANBA provided
construction inspection services for
bridge, highway and overpass seismic
retrofits for different projects in
District 59 as part of an open-ended
contract. |
|
|
| |
|
|
 | |
Corporate
Yard, New Maintenance Service Facility-
South San Francisco, CA NBA provided
mechanical and electrical design for
a 45,000 sq. ft., one-story facility
to be utilized for maintenance, office,
and storage use. The yard included
a paint shop, machine shop, and vehicle
maintenance facilities. Our firm provided
engineering design for HVAC, plumbing,
ventilation, lighting, power, emergency
generator, exterior lighting and electrical
systems. Title 24 documentation was
completed for both the mechanical
and electrical systems. |
|
|
| |
|
|
 | |
Hyde
Street Harbor Water Side Facility
San Francisco, California Phase one
we provided preliminary design and
study for bilge water collection and
sewage collection system, connection
to existing oil water separator and
pump out system. Phase two consisted
of detail design and construction
support of all items in phase one
which consists of providing water,
power and lighting to each berth,
parking lot lighting, drainage system
and pump station. Fire protection
provided at each berth. |
|
|
| |
|
 |
|
Islais Creek MUNI San Francisco, California
Phase I: NBA provided mechanical,
electrical and plumbing design for
MUNI’s new CNG fuel system facility.
The building is a 16 bay bus operation
facility with a tire shop, wash building,
dispensing station, meet and greet
facility, bus storage and employee
parking lot. Phase II: NBA will also
provide mechanical/electrical and
plumbing design for a MUNI administration
building adjacent to the bus facility. |
|
|
| |
|
 |
|
MUNI LRV2 Facility Modifications- San Francisco, CA
Our firm also conducted load studies
and provided single line diagrams
for all three buildings. NBA provided
various strategies to accommodate
present and future electrical loads
and methods of connections through
modifications to two 1500 KVA 12KV-277/480V
substations and the low voltage distribution
systems by adding and locating new
sub-panels and adding circuit breakers
in the main switchboard. |
|
|
| |
|
 | |
Oakland Airport Energy Management System Oakland, CA
Provided total replacement of the
existing automatic temperature control
system. The new building management
system is completely web-based and
will provide monitoring and control
of all HVAC equipment and facility
lighting. Also designed a replacement
for an existing chiller and cooling
tower with all mechanical and electrical
engineering services involved through
construction. |
|
|
| |
|
 | |
T2 Mechanical Room Oakland International Airport Oakland, California
Prime Consultant for the new central
utility plant at Oakland Airport's
new T2 two-level terminal complex.
Hired and managed the architect, structural
and civil engineers, and other sub
consultants. Consulted on green and
sustainable design for the new central
utility plant, required to accommodate
the future needs of the new expanded
terminal and additional facilities. |
|
|
| |
|
 |
|
San Francisco Red Light Photo Enforcement- San Francisco, California
Our firm completed the design of electrical
drawings for the installation of a
photo enforcement camera and completed
field construction inspections of
21 intersections to verify as-built
conditions. We then determined the
most cost effective method for connecting