Academic Middle School San Francisco, California
This is a two-story, 68,000 square
foot building with a separate building
as Multi-Purpose Area. Designed new
energy management system for the entire
school and has control at approximately
100 points. Two steam boilers and
the heating/ventilation unit serving
multi-purpose area had to be replaced
with new ones to be controlled via
Energy Management System. . |
|
|
| |
|
|
 | |
Alice Fong Yu Alternative Middle School San Francisco, California
Alice Fong Yu is the first public
Chinese language immersion school
in the country. Winner of Award of
Excellence in the New Built Category
of the 2002 C.A.S.H. /AIACC Leroy
F. Green Design Awards Program. NBA
provided mechanical and electrical
engineering services to meet fire,
safety, and ADA requirements. |
|
|
| |
|
|
 | |
Bret Harte Elementary School San Francisco, California
Bret Harte was constructed in 1954
and had major renovation in 1969.
It is 79,000 square feet and is in
the Bayview Hunters Point District.
Prop 39 bond money is financing major
mechanical, electrical and plumbing
and fire protection upgrades. It is
being designed under CHPS guidelines.
|
|
|
| |
|
|
 |
Buena Vista Elementary School San Francisco, California
This is a two story 32,500 square
foot building. Provided construction
documents for new lighting fixtures
in corridors, classrooms, multipurpose
room, staff lunch room, offices, rest
rooms, computer networking, and security
system. Replaced circulating pump
and outside air thermostat. Provided
new energy management control panel,
remodeled two toilet rooms, and replaced
toilet exhaust fans and existing water
fountains. |
|
|
| | |
|
 |
|
Cobb Elementary School San Francisco, California
Part of Phase II of San Francisco
Unified School District School Building
Improvements. Replaced plumbing fixtures
on second floor boys' and girls' toilet
rooms to comply with ADA requirements
and changed flushing arrangements
for urinals from automatic (using
timer) to manual |
|
|
| |
|
|
 | |
Daniel Webster Elementary School San Francisco, California
This is a 42,800 SF building that
was built in 1936. Designed emergency
lighting and exit signage. Surveyed
building, provided cost estimates
(unit prices) for florescent lamps,
ballast’s and lenses. Provided
HID fixtures in auditorium. Added
additional receptacles in teachers
room and exhaust fans for the computer
rooms. |
|
|
| |
|
|
 |
|
Douglas High School San Francisco, California
This is a two story 22,000 square
foot building. Project was OLA funded
project consisted of renovation and
code upgrade of heating, plumbing,
and life safety systems. Also improvements
were made to meet ADA requirements
and other energy saving designs were
also implemented.. |
|
|
| | |
|
 |
|
Edison Elementary School San Francisco, California
This is a three-story 59,200 square
foot building. NBA designed new fire
alarm system including horns and strobes
(ADA requirements). Also provided
electrical power, cabling and panels
for additional outlets serving computers
and printers in all classrooms. Also
provided infrastructure for future
computer networking. |
|
|
| |
|
|
 | |
El Dorado Elementary School San Francisco, California
Provided design and construction documents
for demolition of plumbing fixtures,
including water closets, urinals,
lavatories, and classroom sinks. The
new work includes installation of
fixtures in 4 different bathrooms
and classroom sinks with drinking
fountain bubbles in six different
classrooms. |
|
|
| |
|
|
 | |
<Fremont Unified School District Fremont, California
Provided electrical power plan for
modification and addition of electrical
outlets, smoke detectors, and telephone
conduits. Modified the lighting layout,
performed Title 24 energy calculations.
Also provided construction administration,
reviewed shop drawings, and responded
to RFI’s. |
|
|
| |
|
 |
|
George Washington High School San Francisco, California
Performed a walk-through and generated
a report on the HVAC and plumbing
needs of the school for Phase II of
the San Francisco Unified School District
School Building Improvements. |
|
|
| |
|
 | |
John O'Connell High School San Francisco, California
Redesigned complete HVAC plumbing,
fire protection, and electrical systems
for five-story 200,000 SF vocational
high school damaged by 1989 earthquake.
The building required many specialty
HVAC and plumbing systems for different
vocational shops and laboratories.. |
|
|
| |
|
 | |
Los Arboles Elementary School San Jose, California
Provided complete mechanical/plumbing
engineering services for all phases
of the project, including schematic
design, design development, construction
documents, bid/award and construction
administration. Provided Title 24
energy compliance calculations for
mechanical systems and building envelopes.
|
|
|
| |
|
 |
|
Luther Burbank Middle School San Francisco, California
Provided plumbing and ventilation
repairs to classrooms and bathrooms
and renovation to boys’ and
girls’ bathrooms to comply with
ADA requirements. Provided a report
and determined the scope of work with
construction cost estimate. |
|
|
| |
|
 | |
Malcolm X Elementary School San Francisco, California
Part of Phase II of San Francisco
Unified School District School Building
Improvements. Designed plumbing system
to replace 13 plumbing fixtures in
different toilet rooms to comply with
ADA requirements. Provided new drinking
fountains, replaced existing air compressor
and ventilation system in teachers'
lounge as well as three toilet rooms. |
|
|
| |
|
 |
|
Mission Education Center San Francisco, California
This project was among Phase II of
San Francisco School District projects.
Reviewed existing plans for air distribution
and rebalanced the entire system.
Provided construction documents for
testing and balancing, control upgrade,
replacement of existing air compressor
and supply air fans to the building. |
|
|
| |
|
 |
|
Mission High School San Francisco, California
Feasibility study that lead to design
for modernization, renovation and
code upgrade including ADA compliance
of mechanical and electrical systems
for 260,000 SF, 5-story building.
Project included auditorium, classrooms,
and science computer laboratories.
This project was part of the Phase
I San Francisco Unified School District
School Building Improvements. Tasks
consisted of replacing the central
plant steam boiler system, vacuum
pump, sump pump, and all other accessories. |
|
|
| |
|
 |
|
Santee Elementary School San Jose, California
Modernization work and conversion
of library to a faculty room, renovation
of kitchen, conversion of the media
center back to a stage for the multi-purpose
room. Upgraded power in all the rooms,
ventilation for bathrooms and HVAC
distribution modification. Added a
janitor closet, new fire alarm and
emergency lighting system. |
|
|
| |
|
 |
|
Sand Path Academy Project San Francisco California
Provided project management, engineering
and supervision of design of HVAC,
plumbing, fire protection including
electrical power distribution systems
for an existing 8,000 SF retail space
converted into a school facility for
mentally handicapped children. The
facility design included mechanical
and electrical systems for new classroom,
conference, library, restroom, and
meeting rooms. |
|
|
| |
|
 |
|
San Francisco Community Elementary School San Francisco, California
This project was among phase I of
San Francisco School District projects,
a 34,000 SF building that was built
in 1911. The project consisted of
redesigning plumbing and ventilation
systems for Girls and Boys bathrooms
to comply with ADA and designing fire
protection system for the kitchen
hood. |
|
|
| |
|
 |
|
SFUSD "On-Call" Construction Management San Francisco, California
This project consisted of construction
management for twenty-six schools
throughout San Francisco. Our tasks
included: inspection, constructability
review, cost estimate, punch list
and close out as well as other CM
work. . |
|
|
| |
|
 |
|
Oakland Unified School District Oakland, California
Designed the sanitary waste and domestic
water services for portable classrooms
at 41 school sites throughout the
Oakland area. These projects included
sink additions, bathroom, ADA compliance,
utility connections and contacting
Fire Marshall. Performed site visits
and evaluated capacities of existing
utilities. |
|
|
| |
|
 |
|
Roosevelt Middle School San Francisco, California
This project was among phase I of
San Francisco School District projects;
a 121, 000 SF building that was built
in 1930. Designed new fire alarm system
for the entire school, designed under
the floor power for the computer room
and conduits for LAN and control/patch
panel and reconnecting the equipment
in the relocated wood working shop |
|
|
| |
|
 |
|
Sunshine High School San Francisco, California
Renovation and code upgrading of heating,
ventilating, plumbing and fire life
safety systems of a two-story, 47,000
SF building. Upgraded handicapped
toilets to ADA requirements. Performed
an evaluation and needs assessment. |
|
|
| |
|
 |
|
Thurgood Marshall Academic High School San Francisco, California
This is a college prepatory high school
constructed in 1957. It is 134,000
square feet and averages about 1000
students per year 90%of whom graduate.
NBA provided design for long over
due renovations to electrical, HVAC,
and plumbing and fire protection systems.
It is being designed using California
High Performance Schools guideline
and is a DSA project. |
|
|
| |
|
 |
|
Sutro Elementary School San Francisco, California
Provided construction documents plumbing
on first and second floors. Provided
new handicap accessible drinking fountains
at Community Center exterior. Provided
additional electrical outlets and
new walls in each classroom and computer
room. New floor mounted electrical
outlets were included as well as new
outdoor security lighting, and repaired
heating and ventilating unit control
system. |
|
| |
|
 |
|
Winfield Scott Elementary School San Francisco, California
This 33,000 SF building was built
in 1930. Modified boys/girls bathrooms
to comply with ADA requirements. Replaced
sink, water, and gas piping for the
stove in the Nutrition Area. Provided
new sinks in all childcare rooms and
classrooms, water lines and drains
for kitchen area. Provided new accessible
drinking fountains |
|
|